Cleaning and service
38
• Check again that the plunger can be easily moved up and down without
tilting.
6.3.2 Clean grinding area
Fig. 26: Removing the rotor
• Open the grinding area door (T).
• Pull the plunger (B) into the uppermost latching position.
• Screw the removal grip (EG) onto the rotor and pull the rotor from the drive
shaft.
• Remove the sieve.
6.3.3 Remove the discharge flange
3.
Risk of injury to skin and hands
Fast rotating blades
– There is a risk of injury to hands, fingers and skin.
• Never operate the device without the discharge flange
.
Fig. 27: Removing the discharge flange
• Loosen the screw (FS).
• Pull the discharge flange (AV) forwards out of the bracket.
Comments to this Manuals