Retsch SM 100 User Manual Page 1

Browse online or download User Manual for Equipment Retsch SM 100. Retsch SM 100 User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Translation

© Retsch GmbH, 42781 Haan, Retsch-Allee 1-5, Germany 13.05.2013 0000 2TManual2T Cutting Mill SM100 2TTranslation

Page 2

Transport, scope of delivery, installation 10 Pos: 5.1 / 00 005 Über sc hrif ten /1. Ü ber sc hrift en /1 V erp ack ung, Tra ns port un d Auf s

Page 3

Transport, scope of delivery, installation 11 NOTICE Atmospheric humidity – Electronic and mechanical components may be damaged and the performan

Page 4

Transport, scope of delivery, installation 12 Pos: 5.18 .1 / 00 005 Ü ber schr if ten/ 1.1 Ü ber sc hrift e n/1.1 Üb ersc hri ften BD A/11 T yp

Page 5

Transport, scope of delivery, installation 13 Fig. 2: Removing the transport aid Only use the transport aid (TH) when lifting the device. The d

Page 6

Transport, scope of delivery, installation 14 Pos: 5.22 /0 000 5 Üb ers chrif te n/1. 1 Ü bersc hri ft en/ 1.1 Ü ber schr ift en BD A/ 11 G est e

Page 7

Transport, scope of delivery, installation 15 Fig. 5: Fastening the crossbar angle bracket NB Ensure that the crossbar (TR) is aligned flush with

Page 8 - Retsch GmbH directly

Transport, scope of delivery, installation 16 Fig. 7: Mounting the side protective caps • Place the four black plastic caps on the openings. Fig

Page 9 - 2 Confirmation

Transport, scope of delivery, installation 17 Fig. 9: Placing the crossbar on the stand • Place the stand (SQ) on the crossbar. Fig. 10: Points f

Page 10

Transport, scope of delivery, installation 18 • Using the 4 screws, screw the SM100 housing tightly onto the base frame. Pos: 5.24 /0 000 5 Üb e

Page 11 - 3.5 Electrical connection

Transport, scope of delivery, installation 19 Fig. 3: Mounting the feed hopper • Open the grinding area door (T). • Pull the plunger (B) so it e

Page 12 - 3.6 Type plate description

2 Copyright © Copyright by Retsch GmbH Haan, Retsch-Allee 1-5 D-42781 Haan Federal Republic of Germany

Page 13

Transport, scope of delivery, installation 20 NOTE Installation – Depending on the operating status of the mill, there may be slight vibrations. •

Page 14 - 3.8 Frame assembly

Technical data 21 Pos: 6.2 / 00 005 Über sc hrif ten /1. Ü ber sc hrift en /1 Tec h nisc he D ate n @ 0\mod_1222344525522_9.doc @ 2407 @ 1 @ 1

Page 15

Technical data 22 CAUTION Damage to hearing The level of noise can be high depending on the type of material, the knife used, the speed set and t

Page 16

Operating the machine 23 Fig. 4: Dimensions Pos: 6.20 /0 000 5 Üb ers chrif te n/1. 1 Ü bersc hri ft en/ 1.1 Ü ber schr ift en BD A/ 11 E rf orde

Page 17

Operating the machine 24 Fig. 5: Front view G A C B K I H D T U W R S

Page 18

Operating the machine 25 Fig. 6: Grinding area view Pos: 7.4 / 00 010 Be dienu ngs anl eitu nge n K apit els amml ung en /------- Seite numbr u

Page 19

Operating the machine 26 Pos: 7.5 / 00 005 Über sc hrif ten /1.1 Ü b ersc hrif te n/1. 1 Ü bers chri fte n BD A/1 1 Ü bersi cht sta bel le der G

Page 20

Operating the machine 27 Pos: 7. 8 /000 05 Übers chrif ten/1. 1 Über schrif ten/ 1.1 Über schri ften BD A/11 Ö ffnen u nd schl ießen des Gerät es

Page 21 - 4 Technical data

Operating the machine 28 NOTE Reduction of tool service life Abrasive sample materials – The presence of abrasive composite materials during grind

Page 22

Operating the machine 29 5.6 Inserting the filter unit and collecting receptacle Pos: 7.22 /0 001 0 B edien ung sa nleit ung en K a pitels a mml

Page 23 - 5 Operating the machine

3 1 Notes on the Operating Manual ... 5 1.

Page 24 - Operating the machine

Cleaning and service 30 Fig.4: On/off switch You can switch the device on/off using the on/off switch (G). The motor starts up or is shut down w

Page 25

Cleaning and service 31 The cutting gap must be checked to ensure that the device is functioning satisfactorily (target distance 0.3mm). For this r

Page 26

Cleaning and service 32 Fig. 16: Freely rotate the rotor Fig. 17: Adjust the cutting gaps • Using a feeler gauge (BL) check the cutting gap for

Page 27

Cleaning and service 33 Fig. 18: Cutting gap • By twisting the stud bolts (U) to the right, slide the cutting bar closer to the rotor blade an

Page 28

Cleaning and service 34 Fig. 20: Dismantling the sealing ring with felt gasket • Remove the felt gasket (FD). NOTICE • Oil the felt gasket bef

Page 29 - 5.7 Switching On and Off

Cleaning and service 35 Fig. 22: Mounting the sealing ring with felt gasket Pos: 8.5 / 00 005 Über sc hrif ten /1.1 Ü b ersc hrif te n/1. 1 Ü ber

Page 30 - 6 Cleaning and service

Cleaning and service 36 – Lift up the feed hopper safety guard – Remove the feed hopper – Remove the rotor – Remove the sieve – Remove the col

Page 31 - Cleaning and service

Cleaning and service 37 6.3.1.2 Remove the feed hopper WARNING 2.W0004 Risk of injury to skin and hands Fast rotating blades – There is a risk

Page 32

Cleaning and service 38 • Check again that the plunger can be easily moved up and down without tilting. 6.3.2 Clean grinding area Fig. 26: Removi

Page 33

Cleaning and service 39 Pos: 9.1 / 00 010 Be dienu ngs anl eitu ngen K apitel samml ung en/------- Seite numbr uch ----------- @ 0\mod_1222344373

Page 34

4 5.9 Stopping the grinding process ... 30 6

Page 35

Disposal 40 Pos: 9.2 / 00 005 Über sc hrif ten /1. Ü ber sc hrift en /1 E nts orgu ng @ 0\ mod_1234258746831_9.doc @ 6173 @ @ 1 7 Disposal P

Page 36

41 8 Index1 1500 W... 22 A Access to the cutting bars...

Page 37

42 Mounting the feed hopper ... 19, 37 Mounting the Feed Hopper ... 18 N Noise emission ...

Page 40 - 7 Disposal

43 Authorized person for the compilation of technical documents: J. Bunke (technical documentation) The following records are held by Retsch GmbH

Page 43

Copyright ® Copyright by Retsch GmbH Haan, Retsch-Allee 1-5 D-42781 Haan Federal Republic of Germany

Page 44

Notes on the Operating Manual 5 Pos: 1. 1 /000 05 Ü ber sc hrift en /1. Ü ber schr ift en/ 1 Hi nw eise zur Bedi e nung sanl ei tung @ 0\ mod_12

Page 45 - LABORATORY CUTTING MILL

Notes on the Operating Manual 6 Pos: 2.2 / 00 005 Über sc hrif ten /1.1 Ü b ersc hrif te n/1. 1 Ü bers chri ften BD A/11 E rkläru ngen z u den Si

Page 46

Notes on the Operating Manual 7 Pos: 2.5 / 00 005 Über sc hrif ten /1.1 Ü b ersc hrif te n/1. 1 Ü bers chri fte n BD A/1 1 G ener ell e Si cher h

Page 47

Notes on the Operating Manual 8 Pos: 2.11 /0 000 5 Üb ers chrif te n/1. 1 Ü bersc hri ft en/ 1.1 Ü ber schr ift en BD A/ 11 R ep arat ure n @ 0\

Page 48

Confirmation 9 Pos: 3.2 / 00 10 BDA Soft war e/Üb ers chr ift en/1. Üb ersc hr ift en/1 Bes täti gu ng (F or mular für d en B etr eib er) @

Comments to this Manuals

No comments